The Voyage
The fleet sails in milestones. Each milestone is a leg of the voyage — a set of issues, a destination, a verification that the hull holds.
We are currently in the Developer Preview phase. M1 is closed on both ships; M2 is under way.
Bridge — AI Crew Orchestrator
M1: First Watch
Closed · 28/28
Alpha/MVP — deployed secure bridge, DeckChat ↔ crew voice routing, room allowlist, per-user authorization, health probes. Closed 2026-04-27.
M2: Full Complement
Under way · 22/47
Beta — full test coverage, observability (metrics & traces), output redaction hardening, release polish.
M3: Sea Trials
Horizon
Hardening — approval-gated write tools, rate limiting, audit trail, prompt-injection defence, soak testing.
M4: Open Ocean
Horizon
v1.0 — per-crew pods, gRPC sidecars, Redis context, separate Matrix users.
DeckChat — Android Voice Client
M1: First Watch
Closed · 64/64
Alpha/MVP — core voice pipeline, Maren voice, DeckChat client, onboarding wizard, signed-APK release pipeline. Closed 2026-04-29.
M2: Full Complement
Under way · 2/21
Beta — full crew registry, Matrix E2EE hardening, sync reconnection, crew status UI, verbosity.
M3: Sea Trials
Horizon
Hardening — UX accessibility, robustness, testing, Material 3 theming, soak testing.
M4: Open Ocean
Horizon
v1.0 — custom crew voices, F-Droid publication, crew presence, pirate voice identity.